New factory project
Phu Sy’s new factory, built with an export focus.
Phu Sy is preparing a new factory built to higher standards, serving domestic and export customers. This page is updated as the project moves forward.
1,800 m²
Land area
Project site
1,300 m²
Building footprint
Site coverage
4 floors
Building size
Production facility
~1 year
Expected to operate
From September 2026
01 — Project information
Basic information
Location — Lot CN01-02, Hong Duong Industrial Cluster, Dan Hoa Commune, Hanoi
Land area — 1,800 m²
Building size — Building footprint 1,300 m², 4 floors
Focus — Packaging and printed products made to higher standards, aimed at export markets
Current status — Land secured, design in progress
Expected to operate — About 1 year from September 2026
Information may change during design and construction.
02 — Progress
Project stages
01Land securedCompleted
02DesignIn progress
03ConstructionUpcoming
04OperationExpected in about 1 year
Interested in the new factory?